Wednesday, January 26, 2011

Kevins Spare Room Makeover

So Kevin's spare bedroom that had been packed to the ceiling front to back, over several weeks work got emptied out. Floor was wet sanded and sealed, though probably should have gotten a power sander and all that but the budget allowed for wet sanding which got most of the old paint spatters and stains out, other stains are there for the duration. Patched wall areas, sealed stains and all that then on to 3 colors! Wall medium brown, Ceiling semi-gloss white and Crown molding / base boards light brown color. Forward! Lugged powered recliner through the torturous route down a narrow hall and 2 very narrow doors, and nope the back didn't come off without taking the wiring harness apart for the heat/massage unit... Hauled in a corner desk assembly and assembled it. Computer system was relocated, dresser and side table moved in. Huff puff... office chair, light stand, end table, cleared out the closet, relocating his empty luggage to the closet along with summer wear shirts etc. And there you have it.

Floor done
View of the door side of the room
Door is just to the left in this picture, new desk
Looking from the door to the back window, Computer desk on left.